Technical and financial evaluation grid – PR Centru, Action 2.2, Call 2 (criteria structure)

The 4 technical-financial evaluation criteria and sub-criteria as described in the guide (section 8.4). Sub-criterion scores and the maximum score are in Annex 4, not included in the analysed document; the calculator cannot yet compute an exact score.

Source: Ghidul solicitantului – Programul Regiunea Centru 2021-2027, Prioritatea 2 „O regiune digitală”, Acțiunea 2.2 „Întreprinderi digitale pentru o economie avansată”, Apel 2 (AM: ADR Centru), version Cod apel PRC/1059/PRC_P2/OP1/RSO1.2/PRC_A32; ghidul nu are număr de versiune; PDF de 75 de pagini, creat la 30.10.2026 (metadate), pages 14, 22-25, 48, 58-60

Note: the criteria in this tool have not yet been checked against the source document. The result is strictly indicative. [TO BE CONFIRMED]

Fields marked with * are required.

Section 1 / 4

I. Project contribution to the investment priority objective

The guide favours applicants with a low current level. The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

criterii

Reference: Ghid, pag. 58, secț. 8.4, criteriul I [DE CONFIRMAT]

Scored: progress in digitalisation after implementation, per DESI 2019. The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

criterii

Reference: Ghid, pag. 58, secț. 8.4, criteriul I [DE CONFIRMAT]

Do you commit that, after implementation, the company will reach a high level of digitalisation (at least 7 of 12 DESI 2019 criteria)? (required)

If not proven at the final audit, proof is due within one year after completion (p. 18). The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

Reference: Ghid, pag. 58, secț. 8.4, criteriul I [DE CONFIRMAT]

The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

angajați

Reference: Ghid, pag. 58, secț. 8.4, criteriul I [DE CONFIRMAT]

The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

utilizatori/an

Reference: Ghid, pag. 58, secț. 8.4, criteriul I [DE CONFIRMAT]

Section 2 / 4

II. Project quality, maturity and sustainability

Qualitative sub-criterion assessed by evaluators; cannot be turned into an automatically scored question. The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

Reference: Ghid, pag. 58, secț. 8.4, criteriul II [DE CONFIRMAT]

The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

%

Reference: Ghid, pag. 58, secț. 8.4, criteriul II [DE CONFIRMAT]

Together with c2_q4 it gives the intangible/tangible ratio; the guide does not specify the formula. The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

lei

Reference: Ghid, pag. 58, secț. 8.4, criteriul II [DE CONFIRMAT]

See c2_q3. Tangible assets are optional (p. 15). The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

lei

Reference: Ghid, pag. 58, secț. 8.4, criteriul II [DE CONFIRMAT]

Assessed from the financial model; cannot be turned into a simple question. The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

Reference: Ghid, pag. 58, secț. 8.4, criteriul II [DE CONFIRMAT]

Does the project include cooperation with a European Digital Innovation Hub (EDIH) in at least one activity? (required)

An EDIH may also perform the digital maturity audit (p. 42). The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

Reference: Ghid, pag. 58, secț. 8.4, criteriul II [DE CONFIRMAT]

Section 3 / 4

III. Applicant's financial and operational capacity

The minimum is 10% (pp. 14, 46). The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

%

Reference: Ghid, pag. 58, secț. 8.4, criteriul III [DE CONFIRMAT]

The guide does not say whether the total or the eligible investment value is used. The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

%

Reference: Ghid, pag. 58, secț. 8.4, criteriul III [DE CONFIRMAT]

Section 4 / 4

IV. Contribution to sustainable development, equal opportunities, gender equality and non-discrimination, accessibility, environmental protection, including DNSH

Does the project include equal opportunity and treatment measures beyond the legal minimum? (required)

The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

Reference: Ghid, pag. 58, secț. 8.4, criteriul IV; 3.16 (pag. 22); 5.7.5 (pag. 48) [DE CONFIRMAT]

Does the project include DNSH ('do no significant harm') measures beyond the legal minimum? (required)

The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

Reference: Ghid, pag. 58, secț. 8.4, criteriul IV; 3.17 (pag. 23); 5.7.6 (pag. 48) [DE CONFIRMAT]

Does the project promote or encourage technologies (including ICT and assistive technologies) suitable for persons with disabilities? (required)

The guide says such projects get extra points without naming the grid criterion; placing it under criterion IV is an inference. The score for this sub-criterion is set in Annex 4 (ETF grid), not included in the analysed document [TO BE CONFIRMED].

Reference: Ghid, pag. 25, secț. 3.19 [DE CONFIRMAT]

Do not enter personal data in your answers. [TO BE COMPLETED: how long answers are kept and who can access them]